Operation and Maintenance Activities

Percentage of Operation and Maintenance Activities of Building in One Year Period

Universitas Andalas has total operated and maintenanced building around 4.016.731 m2. The maintenance includes micro-hydro power plant, AC, solar roof, and the others. The construction includes ramp, cafe, ablution place, and the others.

1 Total Campus Buildings Area 5.020.914 m2
2 Total Operated Building 4.016.731 m2
  Percentage building that operated and maintenanced >75-99%

 

 

 

 

Maintenance of Micro-Hydro Power Plant Universitas Andalas
Construction of the Ramp for the Dean's Building in Faculty of Engineering Unand
Refinement of Ablution Place in Faculty of Animal Husbandry Unand
Construction of Cafe in Faculty of Animal Husbandry Unand
AC Eco Smart  Maintenance in Faculty of Mathematics & Natural Sciences Unand
Solar Roof Cleaning in Faculty of Agricultural Technology Unand

 

 

 

Additional evidence link:

https://kumparan.com/badan-litbang-esdm/blu-badan-litbang-esdm-unand-teken-kso-kembangkan-pltmh-disaksikan-wamen-esdm/3